Two viaducts on Reno River, each one 250 m long: the first for High Speed Railway Milan-Rome, the second for Railway Line Bologna-Pistoia.
The design concerned also some special hydraulic aspects, due to the needing to canalize the River in different zones for different construction steps, while realizing appropriate provisional works and hydraulic protections.
Copyright © Enigma Engineering S.r.l. – P.Iva 02928871207 – Powered by Tecnidea Team