Petrochemical Plant

Subject: Petrochemical Plant – Location: Arzew (Algeria) – 2009÷2010

Client: BENTINI

Services: Final & Construction Design, Structural and Architectonic of two Electrical Substationn – Amount of Works: € 50.000.000

Status: Built

The design concerned the realization of two multistory Electrical Substation. Material adopted were cast in situ Concrete (foundations and slabs), pre-cast Concrete elements (columns and beams), Steel elements. Standards: Algerian and French. Single construction schedules prepared for each pre-cast element.